SPECIFICATIONS |
||
STRUCTURE |
R.C.C. frame | |
| MASONRY | Concrete Block | |
| FLOORING / DADOING | ||
| Public Sector | Inter-locking bamboo plank flooring | |
| Bedrooms | Vitrified tiles | |
| Dining | Vitrified tiles | |
| Stairs | Marble flooring | |
| Kitchen | Vitrified tiles flooring. Standard Designer Kitchen. | |
| Bathrooms | Designer glazed tiles dado upto 7 ft Ceramic tile flooring | |
| DOORS / WINDOWS | ||
| Main Entrance | Teak Wood frame, Teak Wood veneered paneled shutter, melamine polished | |
| Bedrooms | Teak Wood frame, Teak Wood veneered paneled shutter, melamine polished | |
| Bathrooms | Water proof door painted and laminated inside, veneered / polished outside | |
| FITTINGS / ACCESSORIES |
|
|
| PAINTING | ||
| Exterior | Texture / anti-fungal cement paint | |
| Interior | Oil bound distemper | |
| ELECTRICAL / POWER | 6KVA Power connection for each house. Power would be provided through underground cables. Adequate nos. of light, fan and AC power points T.V. cable connectivity to all rooms Solar Power for optimum lighting with 'SPV' Panels Provision for washing machine and dishwasher Provision for Internet cabling |
|
| Landscape | For front setback would be provided. | |
| WATER SUPPLY / PHE | 24 hours pressurized water supply from a central sump Rain water harvesting for individual bungalows Harvested water for gardening. 200 litre Solar water heater system for each house with back up power provision. | |
| Sewage | Sewage treatment plant | |